Location : Phnom Penh (PHUM PREK )
Works Description : Civil Works of: Tumpun Pumping Station, Electric & Control House, Install Pumping Equipment, Embankment, Slope Protection, Access Road
Completed Date : 2003
- On January 25, 1979, because of a shortage of spare parts and electrical power, this plant was only able to produce 50,000 m3/day of water, compared to its initial capacity of 100,000 m3/day. With financing from the former Soviet Union, technical assistance from the Socialist Republic of Vietnam and OXFAM, and input from PPWSA, the production capacity of this plant increased to 55,000 m3/day.
- In 1995, with grant aid from the French and Japanese Governments, the production capacity of this plant was restored to its original capacity of 100,000 m3/day.
- In 2003, with grant aid from the Japanese Government, the production capacity of this plant reached 150,000m3/day.
- Currently, with technical innovation made by PPWSA's technicians and innovation by the management, this plant is able to produce up to 170,000 m3/day, which is greater than the WTP's initial capacity of 100,000 m3/day.